IS WORK OVER?

Automation index

How much of a Hydrogen technician’s job can AI already do?

An ATEX protocol comes earlier. Working with H2 without leaving a leak do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Hydrogen technician

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
ATEX, purge and the log.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Electrolyser, the stack and the one that drops.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Leak, detector and stopping.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Charge, the tube and not mixing with air.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The client, the station and not skipping the purge.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
No leak, and the protocol done.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • ATEX
  • purge
  • electrolyser
  • H2 detectors
  • stacks
  • hydrogen stations
  • leaks
  • mix with air

Sources for this job· O*NET 17-2199.00· ESCO/ISCO 2149

Milliner

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Block, crown and the material.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Shape, stitch and the brim that will not sit.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Fit, the hair and the one that will not take a pin.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Trim, feather and the balance.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The wedding, the wind and not making a prop hat.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
That it sits, and does not fly.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • hat blocks
  • crowns
  • brims
  • feathers
  • pins
  • fit hats
  • trim
  • balance

Sources for this job· O*NET 51-6051.00· ESCO/ISCO 7531

Analyse my job

Jobs with similar scores

  1. 546Wind-turbine technician19%
  2. 547Battery technician19%
  3. 548Biogas technician19%
  4. 550Small-hydro technician19%
  5. 551Surgical technologist19%
  6. 552Weaver19%