Automation index
How much of a Hydrologist’s job can AI already do?
A hydrograph comes earlier. Calling the rise without leaving the village blind do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Hydrologist
22%
AI can already do 22% of this job.
#382 / 733
View rankingHydrologist
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Hydrograph, catchment and the model.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Field, gauging and the one that does not read.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Flood, the alert and not delaying.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Low flow, irrigation and the clash.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The authority, the figure and not dressing the flow.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
If the river rises, call it.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- hydrographs
- catchments
- gauging
- floods
- low flow
- hydrology alerts
- flows
- the river authority
Sources for this job· O*NET 19-2043.00· ESCO/ISCO 2114
IS WORK OVER?
Bridge engineer
22%
#386 / 733
View rankingBridge engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Model, loads and the span.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Works, the prestress and the one who did not tension.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Inspection, the crack and not looking away.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Traffic, the closure and not leaving the village hanging.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The contractor, the rush and not jumping to a yes.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
That it takes the lorry, and not signing the crack.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- spans
- prestress
- cracks
- bridge inspection
- loads
- traffic closures
- structural models
- tensioning
Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142