IS WORK OVER?

Automation index

How much of a Hydrologist’s job can AI already do?

A hydrograph comes earlier. Calling the rise without leaving the village blind do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Hydrologist

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Hydrograph, catchment and the model.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Field, gauging and the one that does not read.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Flood, the alert and not delaying.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Low flow, irrigation and the clash.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The authority, the figure and not dressing the flow.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
If the river rises, call it.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • hydrographs
  • catchments
  • gauging
  • floods
  • low flow
  • hydrology alerts
  • flows
  • the river authority

Sources for this job· O*NET 19-2043.00· ESCO/ISCO 2114

Crane operator

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Lift plan, radii and weights.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Run the crane and place the load.
Estimate

No public source provides a precise figure. This is our estimate.

24%8%+1.9
Signals, wind and exclusion zone.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Site, foreman and maintenance.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Logs, inspections and machine tests.
Estimate

No public source provides a precise figure. This is our estimate.

14%22%+3.1
Not leaving a load over someone.
Estimate

No public source provides a precise figure. This is our estimate.

14%14%+2
Total100%16%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Lift plan, radii and weights
  • Run the crane and place the load
  • Signals, wind and exclusion zone
  • Site, foreman and maintenance
  • Logs, inspections and machine tests
  • Not leaving a load over someone
  • gruista
  • operador de grua
  • crane operator

Sources for this job· O*NET 53-7021.00· ESCO/ISCO 8343

Analyse my job

Jobs with similar scores

  1. 336Geriatrician22%
  2. 337Nature guide22%
  3. 338Ice-cream maker22%
  4. 340Agronomist22%
  5. 341Mining engineer22%
  6. 342Forestry engineer22%