Automation index
How much of a Hydrologist’s job can AI already do?
A hydrograph comes earlier. Calling the rise without leaving the village blind do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Hydrologist
22%
AI can already do 22% of this job.
#339 / 633
View rankingHydrologist
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Hydrograph, catchment and the model.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Field, gauging and the one that does not read.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Flood, the alert and not delaying.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Low flow, irrigation and the clash.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The authority, the figure and not dressing the flow.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
If the river rises, call it.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- hydrographs
- catchments
- gauging
- floods
- low flow
- hydrology alerts
- flows
- the river authority
Sources for this job· O*NET 19-2043.00· ESCO/ISCO 2114
IS WORK OVER?
Forklift operator
17%
#587 / 633
View rankingForklift operator
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Notes, locations and picking routes.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Drive, lift and stack.EstimateNo public source provides a precise figure. This is our estimate. | 24% | 8% | +1.9 |
Loads, centres of gravity and aisles.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
Shift, radio and dock.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Logs, incidents and counts.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 22% | +3.1 |
Not hitting anyone or a pallet.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 14% | +2 |
| Total | 100% | 17% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Notes, locations and picking routes
- Drive, lift and stack
- Loads, centres of gravity and aisles
- Shift, radio and dock
- Logs, incidents and counts
- Not hitting anyone or a pallet
- carretillero
- carretilla
- forklift
Sources for this job· O*NET 53-7051.00· ESCO/ISCO 8344