Automation index
How much of a Hydrologist’s job can AI already do?
A hydrograph comes earlier. Calling the rise without leaving the village blind do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Hydrologist
22%
AI can already do 22% of this job.
#339 / 633
View rankingHydrologist
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Hydrograph, catchment and the model.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Field, gauging and the one that does not read.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Flood, the alert and not delaying.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Low flow, irrigation and the clash.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The authority, the figure and not dressing the flow.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
If the river rises, call it.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- hydrographs
- catchments
- gauging
- floods
- low flow
- hydrology alerts
- flows
- the river authority
Sources for this job· O*NET 19-2043.00· ESCO/ISCO 2114
IS WORK OVER?
Marine engineer
21%
#427 / 633
View rankingMarine engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Rounds, parameters and the engine log.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 36% | +5.8 |
Breakdown, the sea and repairing with what you have.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 12% | +2.2 |
Fuel, oils and the port change.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Watch, alarms and the one who does not sleep.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Survey, class and not dressing the log.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
Last the crossing, and not silencing the alarm.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 21% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- engine rounds
- engine log
- breakdowns at sea
- watches
- class
- fuels
- engine-room alarms
- repair on passage
Sources for this job· O*NET 53-5031.00· ESCO/ISCO 3151