Automation index
How much of a Hydrologist’s job can AI already do?
A hydrograph comes earlier. Calling the rise without leaving the village blind do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Hydrologist
22%
AI can already do 22% of this job.
#339 / 633
View rankingHydrologist
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Hydrograph, catchment and the model.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Field, gauging and the one that does not read.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Flood, the alert and not delaying.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Low flow, irrigation and the clash.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The authority, the figure and not dressing the flow.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
If the river rises, call it.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- hydrographs
- catchments
- gauging
- floods
- low flow
- hydrology alerts
- flows
- the river authority
Sources for this job· O*NET 19-2043.00· ESCO/ISCO 2114
IS WORK OVER?
Tower crane operator
18%
#573 / 633
View rankingTower crane operator
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Radius, winds and the day’s log.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Hoist, trolley and the slinger’s call.EstimateNo public source provides a precise figure. This is our estimate. | 24% | 6% | +1.4 |
Erect, climb and the base that is checked.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Two-crane lifts and crossing jibs.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The wind that gets up and stopping in time.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 18% | +2.5 |
Sweep nobody, and not pushing the radius.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 10% | +1.4 |
| Total | 100% | 18% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- tower-crane lifts
- load charts
- climb the crane
- slinger’s call
- jib wind
- crossing jibs
- crane base
- trolley
Sources for this job· O*NET 53-7021.00· ESCO/ISCO 8343