Automation index
How much of a ICU nurse’s job can AI already do?
A vitals log comes earlier. Catching the change and calling in time do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
ICU nurse
20%
AI can already do 20% of this job.
#452 / 633
View rankingICU nurse
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Charts, pumps and the bed plan.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 36% | +5.8 |
Lines, ventilator and the patient who crashes.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Hygiene, turning and preventing sores.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Family at the bed and the news.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
On-call, admissions and handover.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Catch the change and owning the bed.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 20% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- ICU care
- run the ventilator
- central lines
- chart vitals
- prevent sores
- ICU handover
- infusion pumps
- call the intensivist
Sources for this job· O*NET 29-1141.00· ESCO/ISCO 2221
IS WORK OVER?
Process engineer
26%
#205 / 633
View rankingProcess engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
P&IDs, balances and the operating procedure.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Plant, trials and the real bottleneck.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Capacity, yields and the improvement report.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Start-up, shutdown and the shift that skips the SOP.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Process safety and the HAZOP that hurts.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Not overloading the reactor, and signing the change.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 26% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- P&IDs
- mass balances
- HAZOP
- plant start-up
- improve yields
- SOP
- bottlenecks
- process safety
Sources for this job· O*NET 17-2112.00· ESCO/ISCO 2141