Automation index
How much of a Illustrator’s job can AI already do?
A sketch and a palette come earlier. An image that tells and actually ships does not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Illustrator
21%
AI can already do 21% of this job.
#502 / 733
View rankingIllustrator
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Sketches, palettes and a first pass.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 40% | +7.2 |
Draw, paint and close the plate.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Client, changes and not watering the view.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Files, print and rights.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Diary, invoices and life between jobs.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 16% | +2.6 |
Not delivering a drawing that is not yours.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 14% | +2.2 |
| Total | 100% | 21% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Sketches, palettes and a first pass
- Draw, paint and close the plate
- Client, changes and not watering the view
- Files, print and rights
- Diary, invoices and life between jobs
- Not delivering a drawing that is not yours
- ilustrador
- illustrator
Sources for this job· O*NET 27-1013.00· ESCO/ISCO 2166
IS WORK OVER?
Bridge engineer
22%
#386 / 733
View rankingBridge engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Model, loads and the span.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Works, the prestress and the one who did not tension.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Inspection, the crack and not looking away.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Traffic, the closure and not leaving the village hanging.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The contractor, the rush and not jumping to a yes.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
That it takes the lorry, and not signing the crack.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- spans
- prestress
- cracks
- bridge inspection
- loads
- traffic closures
- structural models
- tensioning
Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142