IS WORK OVER?

Automation index

How much of a Illustrator’s job can AI already do?

A sketch and a palette come earlier. An image that tells and actually ships does not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Illustrator

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Sketches, palettes and a first pass.
Estimate

No public source provides a precise figure. This is our estimate.

18%40%+7.2
Draw, paint and close the plate.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Client, changes and not watering the view.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Files, print and rights.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Diary, invoices and life between jobs.
Estimate

No public source provides a precise figure. This is our estimate.

16%16%+2.6
Not delivering a drawing that is not yours.
Estimate

No public source provides a precise figure. This is our estimate.

16%14%+2.2
Total100%21%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Sketches, palettes and a first pass
  • Draw, paint and close the plate
  • Client, changes and not watering the view
  • Files, print and rights
  • Diary, invoices and life between jobs
  • Not delivering a drawing that is not yours
  • ilustrador
  • illustrator

Sources for this job· O*NET 27-1013.00· ESCO/ISCO 2166

Building surveyor

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Quantities, valuations and cost control.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Working drawings and trade coordination.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Site, visits and safety.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Client, contractor and site team.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Quality, tests and the building book.
Estimate

No public source provides a precise figure. This is our estimate.

18%16%+2.9
Sign a build that will not fall.
Estimate

No public source provides a precise figure. This is our estimate.

16%14%+2.2
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • building plans
  • renders
  • sign a project
  • Quantities, valuations and cost control
  • Working drawings and trade coordination
  • Site, visits and safety
  • Client, contractor and site team
  • Quality, tests and the building book
  • Sign a build that will not fall
  • arquitecto tecnico

Sources for this job· O*NET 17-3011.00· ESCO/ISCO 3112

Analyse my job

Jobs with similar scores

  1. 429Livestock farmer21%
  2. 430Gynaecologist21%
  3. 431Executive housekeeper21%
  4. 433Waterproofer21%
  5. 434Solar installer21%
  6. 435Train conductor21%