Automation index
How much of a Illustrator’s job can AI already do?
A sketch and a palette come earlier. An image that tells and actually ships does not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Illustrator
21%
AI can already do 21% of this job.
#418 / 623
View rankingIllustrator
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Sketches, palettes and a first pass.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 40% | +7.2 |
Draw, paint and close the plate.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Client, changes and not watering the view.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Files, print and rights.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Diary, invoices and life between jobs.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 16% | +2.6 |
Not delivering a drawing that is not yours.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 14% | +2.2 |
| Total | 100% | 21% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Sketches, palettes and a first pass
- Draw, paint and close the plate
- Client, changes and not watering the view
- Files, print and rights
- Diary, invoices and life between jobs
- Not delivering a drawing that is not yours
- ilustrador
- illustrator
Sources for this job· O*NET 27-1013.00· ESCO/ISCO 2166
IS WORK OVER?
Data engineer
31%
#36 / 623
View rankingData engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Design pipelines, models and orchestration.EstimateNo public source provides a precise figure. This is our estimate. | 24% | 50% | +12 |
Write SQL, Spark and data tests.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 45% | +8.1 |
Incidents, quality and lineage in production.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Talk to analysts and negotiate data contracts.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Cloud cost, permissions and PII.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 15% | +2.1 |
Decide architecture and technical debt.EstimateNo public source provides a precise figure. This is our estimate. | 12% | 20% | +2.4 |
| Total | 100% | 31% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Design pipelines, models and orchestration
- Write SQL, Spark and data tests
- Cloud cost, permissions and PII
- Decide architecture and technical debt
- ingeniero de datos
- data engineer
- etl
Sources for this job· O*NET 15-1243.00· ESCO/ISCO 2511