IS WORK OVER?

Automation index

How much of a Illustrator’s job can AI already do?

A sketch and a palette come earlier. An image that tells and actually ships does not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Illustrator

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Sketches, palettes and a first pass.
Estimate

No public source provides a precise figure. This is our estimate.

18%40%+7.2
Draw, paint and close the plate.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Client, changes and not watering the view.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Files, print and rights.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Diary, invoices and life between jobs.
Estimate

No public source provides a precise figure. This is our estimate.

16%16%+2.6
Not delivering a drawing that is not yours.
Estimate

No public source provides a precise figure. This is our estimate.

16%14%+2.2
Total100%21%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Sketches, palettes and a first pass
  • Draw, paint and close the plate
  • Client, changes and not watering the view
  • Files, print and rights
  • Diary, invoices and life between jobs
  • Not delivering a drawing that is not yours
  • ilustrador
  • illustrator

Sources for this job· O*NET 27-1013.00· ESCO/ISCO 2166

Geotechnical engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Borehole, the sample and the report.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Field, the water table and the one that was not read.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Foundations, the clay and not hiding it.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Slope, the factor and not signing the one that slips.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The architect, the rush and not jumping to a yes.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
If it stands, sign it. And not hiding the clay.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • boreholes
  • water table
  • clays
  • foundations
  • slopes
  • soil samples
  • geotech reports
  • factors of safety

Sources for this job· O*NET 17-2151.00· ESCO/ISCO 2142

Analyse my job

Jobs with similar scores

  1. 499Livestock farmer21%
  2. 500Gynaecologist21%
  3. 501Executive housekeeper21%
  4. 503Waterproofer21%
  5. 504Solar installer21%
  6. 505Train conductor21%