Automation index
How much of a Illustrator’s job can AI already do?
A sketch and a palette come earlier. An image that tells and actually ships does not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Illustrator
21%
AI can already do 21% of this job.
#502 / 733
View rankingIllustrator
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Sketches, palettes and a first pass.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 40% | +7.2 |
Draw, paint and close the plate.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Client, changes and not watering the view.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Files, print and rights.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Diary, invoices and life between jobs.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 16% | +2.6 |
Not delivering a drawing that is not yours.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 14% | +2.2 |
| Total | 100% | 21% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Sketches, palettes and a first pass
- Draw, paint and close the plate
- Client, changes and not watering the view
- Files, print and rights
- Diary, invoices and life between jobs
- Not delivering a drawing that is not yours
- ilustrador
- illustrator
Sources for this job· O*NET 27-1013.00· ESCO/ISCO 2166
IS WORK OVER?
Geotechnical engineer
22%
#391 / 733
View rankingGeotechnical engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Borehole, the sample and the report.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Field, the water table and the one that was not read.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Foundations, the clay and not hiding it.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Slope, the factor and not signing the one that slips.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The architect, the rush and not jumping to a yes.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
If it stands, sign it. And not hiding the clay.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- boreholes
- water table
- clays
- foundations
- slopes
- soil samples
- geotech reports
- factors of safety
Sources for this job· O*NET 17-2151.00· ESCO/ISCO 2142