Automation index
How much of a Industrial engineer’s job can AI already do?
Simulating a line and drafting a procedure can already be farmed out. Planting it into real shifts cannot.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Industrial engineer
28%
AI can already do 28% of this job.
#102 / 693
View rankingIndustrial engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Model processes, balances and a first plant layout.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 45% | +9.9 |
Draft procedures, PFDs and operating instructions.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 40% | +7.2 |
Analyse cost, bottlenecks and OEE from data.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Coordinate suppliers, maintenance and production.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Commissioning and plant trials.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
Capex calls and industrial-safety liability.EstimateNo public source provides a precise figure. This is our estimate. | 12% | 10% | +1.2 |
| Total | 100% | 28% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Commissioning and plant trials
- ingeniero industrial
- industrial engineer
- procesos industriales
Sources for this job· O*NET 17-2112.00· ESCO/ISCO 2141
IS WORK OVER?
Adult literacy tutor
22%
#335 / 693
View rankingAdult literacy tutor
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Level, the sheet and the one who did not come.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Reading, the contract and the small print.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Writing, the form and not doing it for them.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Group, the shame and not exposing them.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The council, the grant and not inflating attendance.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
That they read the contract, and not being ashamed.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- syllables
- reading contracts
- forms
- literacy groups
- shame
- small print
- attendance
- not expose
Sources for this job· O*NET 25-3011.00· ESCO/ISCO 2359