Automation index
How much of a Industrial engineer’s job can AI already do?
Simulating a line and drafting a procedure can already be farmed out. Planting it into real shifts cannot.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Industrial engineer
28%
AI can already do 28% of this job.
#102 / 623
View rankingIndustrial engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Model processes, balances and a first plant layout.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 45% | +9.9 |
Draft procedures, PFDs and operating instructions.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 40% | +7.2 |
Analyse cost, bottlenecks and OEE from data.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Coordinate suppliers, maintenance and production.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Commissioning and plant trials.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
Capex calls and industrial-safety liability.EstimateNo public source provides a precise figure. This is our estimate. | 12% | 10% | +1.2 |
| Total | 100% | 28% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Commissioning and plant trials
- ingeniero industrial
- industrial engineer
- procesos industriales
Sources for this job· O*NET 17-2112.00· ESCO/ISCO 2141
IS WORK OVER?
Alarm installer
23%
#300 / 623
View rankingAlarm installer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Diagram, zones and programming the panel.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Wire, sensors and the detector that trips alone.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
ARC, tests and the connection note.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Train the user and the fob that gets lost.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The lived-in flat, the brick and not breaking extra.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
No false alarms, and a real call-out.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 23% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- fit alarms
- program panels
- wire sensors
- ARC
- avoid false alarms
- train the user
- detectors
- alarm zones
Sources for this job· O*NET 49-2098.00· ESCO/ISCO 7412