Automation index
How much of a Industrial engineer’s job can AI already do?
Simulating a line and drafting a procedure can already be farmed out. Planting it into real shifts cannot.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Industrial engineer
28%
AI can already do 28% of this job.
#102 / 623
View rankingIndustrial engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Model processes, balances and a first plant layout.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 45% | +9.9 |
Draft procedures, PFDs and operating instructions.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 40% | +7.2 |
Analyse cost, bottlenecks and OEE from data.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Coordinate suppliers, maintenance and production.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Commissioning and plant trials.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
Capex calls and industrial-safety liability.EstimateNo public source provides a precise figure. This is our estimate. | 12% | 10% | +1.2 |
| Total | 100% | 28% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Commissioning and plant trials
- ingeniero industrial
- industrial engineer
- procesos industriales
Sources for this job· O*NET 17-2112.00· ESCO/ISCO 2141
IS WORK OVER?
Cloud architect
28%
#82 / 623
View rankingCloud architect
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Diagrams, ADRs and a first IaC pass.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 48% | +10.6 |
Cost estimate, Well-Architected and gaps.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 40% | +7.2 |
Review PRs, security and network.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 20% | +3.2 |
Align with security, finops and product.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 15% | +2.4 |
PoCs, real failures and vendor limits.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 18% | +2.5 |
Sign the design and own the incident.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 14% | +2 |
| Total | 100% | 28% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- building plans
- renders
- sign a project
- Diagrams, ADRs and a first IaC pass
- Cost estimate, Well-Architected and gaps
- Review PRs, security and network
- Align with security, finops and product
- PoCs, real failures and vendor limits
- Sign the design and own the incident
- arquitecto cloud
Sources for this job· O*NET 15-1243.01· ESCO/ISCO 2511