Automation index
How much of a Industrial engineer’s job can AI already do?
Simulating a line and drafting a procedure can already be farmed out. Planting it into real shifts cannot.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Industrial engineer
28%
AI can already do 28% of this job.
#102 / 743
View rankingIndustrial engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Model processes, balances and a first plant layout.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 45% | +9.9 |
Draft procedures, PFDs and operating instructions.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 40% | +7.2 |
Analyse cost, bottlenecks and OEE from data.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Coordinate suppliers, maintenance and production.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Commissioning and plant trials.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
Capex calls and industrial-safety liability.EstimateNo public source provides a precise figure. This is our estimate. | 12% | 10% | +1.2 |
| Total | 100% | 28% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Commissioning and plant trials
- ingeniero industrial
- industrial engineer
- procesos industriales
Sources for this job· O*NET 17-2112.00· ESCO/ISCO 2141
IS WORK OVER?
Control engineer
22%
#386 / 743
View rankingControl engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
PID, tune and the model.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Plant, the swing and the one that runs away.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Mode, manual and not leaving it for ever.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Alarm, the interlock and not silencing it.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Operations, the recipe and not changing blind.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
That it does not swing, and not leaving manual for ever.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- PID
- tune
- swings
- manual mode
- interlocks
- recipes
- control models
- not silence alarms
Sources for this job· O*NET 17-2199.00· ESCO/ISCO 2149