Automation index
How much of a Industrial engineer’s job can AI already do?
Simulating a line and drafting a procedure can already be farmed out. Planting it into real shifts cannot.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Industrial engineer
28%
AI can already do 28% of this job.
#102 / 623
View rankingIndustrial engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Model processes, balances and a first plant layout.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 45% | +9.9 |
Draft procedures, PFDs and operating instructions.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 40% | +7.2 |
Analyse cost, bottlenecks and OEE from data.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Coordinate suppliers, maintenance and production.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Commissioning and plant trials.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
Capex calls and industrial-safety liability.EstimateNo public source provides a precise figure. This is our estimate. | 12% | 10% | +1.2 |
| Total | 100% | 28% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Commissioning and plant trials
- ingeniero industrial
- industrial engineer
- procesos industriales
Sources for this job· O*NET 17-2112.00· ESCO/ISCO 2141
IS WORK OVER?
Costume designer
22%
#333 / 623
View rankingCostume designer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
The reading, sketch and the palette.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Shop, fitting and the one you cannot sit in.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Rehearsal, quick change and the one that catches.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Budget, dyes and the one that is late.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Direction, the ego and not dressing against the text.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
That you can act, and not splitting on the third.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- costume sketches
- costume fittings
- quick changes
- palette
- wardrobe shop
- dyes
- rehearsals
- costume budget
Sources for this job· O*NET 27-1022.00· ESCO/ISCO 2163