Automation index
How much of a Industrial engineer’s job can AI already do?
Simulating a line and drafting a procedure can already be farmed out. Planting it into real shifts cannot.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Industrial engineer
28%
AI can already do 28% of this job.
#102 / 623
View rankingIndustrial engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Model processes, balances and a first plant layout.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 45% | +9.9 |
Draft procedures, PFDs and operating instructions.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 40% | +7.2 |
Analyse cost, bottlenecks and OEE from data.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Coordinate suppliers, maintenance and production.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Commissioning and plant trials.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
Capex calls and industrial-safety liability.EstimateNo public source provides a precise figure. This is our estimate. | 12% | 10% | +1.2 |
| Total | 100% | 28% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Commissioning and plant trials
- ingeniero industrial
- industrial engineer
- procesos industriales
Sources for this job· O*NET 17-2112.00· ESCO/ISCO 2141
IS WORK OVER?
Film director
19%
#486 / 623
View rankingFilm director
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Breakdown, storyboard and shooting plan.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 40% | +7.2 |
Casting, locations and pre-rehearsal.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Direct on set: action, continuity and taste.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Edit, colour and sound with the team.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Handle producer, time and budget.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
Vision of the film and final cut.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 10% | +1.4 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Breakdown, storyboard and shooting plan
- Casting, locations and pre-rehearsal
- Edit, colour and sound with the team
- Handle producer, time and budget
- Vision of the film and final cut
- director de cine
- film director
- realizador
Sources for this job· O*NET 27-2012.00· ESCO/ISCO 2654