IS WORK OVER?

Automation index

How much of a Industrial engineer’s job can AI already do?

Simulating a line and drafting a procedure can already be farmed out. Planting it into real shifts cannot.

This percentage does not predict how many people will lose their jobs.

Task comparison

Industrial engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Model processes, balances and a first plant layout.
Estimate

No public source provides a precise figure. This is our estimate.

22%45%+9.9
Draft procedures, PFDs and operating instructions.
Estimate

No public source provides a precise figure. This is our estimate.

18%40%+7.2
Analyse cost, bottlenecks and OEE from data.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Coordinate suppliers, maintenance and production.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Commissioning and plant trials.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Capex calls and industrial-safety liability.
Estimate

No public source provides a precise figure. This is our estimate.

12%10%+1.2
Total100%28%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Commissioning and plant trials
  • ingeniero industrial
  • industrial engineer
  • procesos industriales

Sources for this job· O*NET 17-2112.00· ESCO/ISCO 2141

Florist

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Orders, suppliers and a first design.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Compose, tie and condition.
Estimate

No public source provides a precise figure. This is our estimate.

22%10%+2.2
Weddings, funerals and difficult clients.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Shop, window and waste.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Cold room, water and the flower calendar.
Estimate

No public source provides a precise figure. This is our estimate.

16%16%+2.6
Not delivering a bouquet that dies tomorrow.
Estimate

No public source provides a precise figure. This is our estimate.

14%14%+2
Total100%18%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Orders, suppliers and a first design
  • Compose, tie and condition
  • Weddings, funerals and difficult clients
  • Shop, window and waste
  • Cold room, water and the flower calendar
  • florista
  • florist

Sources for this job· O*NET 27-1023.00· ESCO/ISCO 7549

Analyse my job

Jobs with similar scores

  1. 99Plumber28%
  2. 100Photographer28%
  3. 101Tour guide28%
  4. 103Site reliability engineer28%
  5. 104Tax inspector28%
  6. 105Inventory clerk28%