Automation index
How much of a Industrial engineer’s job can AI already do?
Simulating a line and drafting a procedure can already be farmed out. Planting it into real shifts cannot.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Industrial engineer
28%
AI can already do 28% of this job.
#102 / 623
View rankingIndustrial engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Model processes, balances and a first plant layout.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 45% | +9.9 |
Draft procedures, PFDs and operating instructions.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 40% | +7.2 |
Analyse cost, bottlenecks and OEE from data.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Coordinate suppliers, maintenance and production.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Commissioning and plant trials.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
Capex calls and industrial-safety liability.EstimateNo public source provides a precise figure. This is our estimate. | 12% | 10% | +1.2 |
| Total | 100% | 28% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Commissioning and plant trials
- ingeniero industrial
- industrial engineer
- procesos industriales
Sources for this job· O*NET 17-2112.00· ESCO/ISCO 2141
IS WORK OVER?
Florist
18%
#555 / 623
View rankingFlorist
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Orders, suppliers and a first design.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Compose, tie and condition.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 10% | +2.2 |
Weddings, funerals and difficult clients.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Shop, window and waste.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Cold room, water and the flower calendar.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 16% | +2.6 |
Not delivering a bouquet that dies tomorrow.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 14% | +2 |
| Total | 100% | 18% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Orders, suppliers and a first design
- Compose, tie and condition
- Weddings, funerals and difficult clients
- Shop, window and waste
- Cold room, water and the flower calendar
- florista
- florist
Sources for this job· O*NET 27-1023.00· ESCO/ISCO 7549