IS WORK OVER?

Automation index

How much of a Industrial engineer’s job can AI already do?

Simulating a line and drafting a procedure can already be farmed out. Planting it into real shifts cannot.

This percentage does not predict how many people will lose their jobs.

Task comparison

Industrial engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Model processes, balances and a first plant layout.
Estimate

No public source provides a precise figure. This is our estimate.

22%45%+9.9
Draft procedures, PFDs and operating instructions.
Estimate

No public source provides a precise figure. This is our estimate.

18%40%+7.2
Analyse cost, bottlenecks and OEE from data.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Coordinate suppliers, maintenance and production.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Commissioning and plant trials.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Capex calls and industrial-safety liability.
Estimate

No public source provides a precise figure. This is our estimate.

12%10%+1.2
Total100%28%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Commissioning and plant trials
  • ingeniero industrial
  • industrial engineer
  • procesos industriales

Sources for this job· O*NET 17-2112.00· ESCO/ISCO 2141

Forensic pathologist

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Read the history, the police file and the scene notes.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Autopsy, injuries and samples.
Estimate

No public source provides a precise figure. This is our estimate.

22%10%+2.2
Report, dating and the causal link.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Give evidence, confirm and hold the lawyer.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Bodily-harm assessment and sick leave.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Chain of custody and owning the opinion.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%23%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • do autopsies
  • forensic opinion
  • assess injuries
  • give evidence
  • causal link
  • chain of custody
  • body at the scene
  • bodily harm

Sources for this job· O*NET 29-1222.00· ESCO/ISCO 2212

Analyse my job

Jobs with similar scores

  1. 99Plumber28%
  2. 100Photographer28%
  3. 101Tour guide28%
  4. 103Site reliability engineer28%
  5. 104Tax inspector28%
  6. 105Inventory clerk28%