Automation index
How much of a Industrial engineer’s job can AI already do?
Simulating a line and drafting a procedure can already be farmed out. Planting it into real shifts cannot.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Industrial engineer
28%
AI can already do 28% of this job.
#102 / 623
View rankingIndustrial engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Model processes, balances and a first plant layout.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 45% | +9.9 |
Draft procedures, PFDs and operating instructions.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 40% | +7.2 |
Analyse cost, bottlenecks and OEE from data.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Coordinate suppliers, maintenance and production.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Commissioning and plant trials.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
Capex calls and industrial-safety liability.EstimateNo public source provides a precise figure. This is our estimate. | 12% | 10% | +1.2 |
| Total | 100% | 28% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Commissioning and plant trials
- ingeniero industrial
- industrial engineer
- procesos industriales
Sources for this job· O*NET 17-2112.00· ESCO/ISCO 2141
IS WORK OVER?
Franchise consultant
27%
#145 / 623
View rankingFranchise consultant
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Pack, numbers and the profile.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Candidate, the unit and the one without capital.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Contract, royalties and not hiding them.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Opening, the plan and the one who is late.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The network, the clash and not selling occupied territories.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Understand the risk, and not buying a dream.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 27% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- franchise packs
- royalties
- units
- capital
- openings
- territories
- contracts
- candidate profiles
Sources for this job· O*NET 13-1111.00· ESCO/ISCO 2421