IS WORK OVER?

Automation index

How much of a Industrial engineer’s job can AI already do?

Simulating a line and drafting a procedure can already be farmed out. Planting it into real shifts cannot.

This percentage does not predict how many people will lose their jobs.

Task comparison

Industrial engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Model processes, balances and a first plant layout.
Estimate

No public source provides a precise figure. This is our estimate.

22%45%+9.9
Draft procedures, PFDs and operating instructions.
Estimate

No public source provides a precise figure. This is our estimate.

18%40%+7.2
Analyse cost, bottlenecks and OEE from data.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Coordinate suppliers, maintenance and production.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Commissioning and plant trials.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Capex calls and industrial-safety liability.
Estimate

No public source provides a precise figure. This is our estimate.

12%10%+1.2
Total100%28%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Commissioning and plant trials
  • ingeniero industrial
  • industrial engineer
  • procesos industriales

Sources for this job· O*NET 17-2112.00· ESCO/ISCO 2141

Furniture assembler

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Manual, fittings and the parts count.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Assemble, plumb and the wrong screw.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Up the stairs without marking the wall.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Adjust doors, drawers and the client watching.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The small flat and the piece that will not fit whole.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
That it does not wobble, and not leaving a fitting out.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • assemble furniture
  • fittings
  • plumb wardrobes
  • adjust doors
  • drawers
  • up the stairs
  • parts count
  • screws

Sources for this job· O*NET 51-2092.00· ESCO/ISCO 8219

Analyse my job

Jobs with similar scores

  1. 99Plumber28%
  2. 100Photographer28%
  3. 101Tour guide28%
  4. 103Site reliability engineer28%
  5. 104Tax inspector28%
  6. 105Inventory clerk28%