Automation index
How much of a Industrial engineer’s job can AI already do?
Simulating a line and drafting a procedure can already be farmed out. Planting it into real shifts cannot.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Industrial engineer
28%
AI can already do 28% of this job.
#102 / 623
View rankingIndustrial engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Model processes, balances and a first plant layout.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 45% | +9.9 |
Draft procedures, PFDs and operating instructions.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 40% | +7.2 |
Analyse cost, bottlenecks and OEE from data.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Coordinate suppliers, maintenance and production.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Commissioning and plant trials.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
Capex calls and industrial-safety liability.EstimateNo public source provides a precise figure. This is our estimate. | 12% | 10% | +1.2 |
| Total | 100% | 28% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Commissioning and plant trials
- ingeniero industrial
- industrial engineer
- procesos industriales
Sources for this job· O*NET 17-2112.00· ESCO/ISCO 2141
IS WORK OVER?
Geologist
23%
#296 / 623
View rankingGeologist
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Maps, sections and a first report.EstimateNo public source provides a precise figure. This is our estimate. | 20% | 42% | +8.4 |
Process boreholes, GIS and lab.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 35% | +5.6 |
Field camp, outcrop and sampling.EstimateNo public source provides a precise figure. This is our estimate. | 20% | 12% | +2.4 |
Read hazard, water and deposit.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 15% | +2.4 |
Talk to works, mine or government.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 14% | +2 |
Sign the opinion and own the real ground.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 16% | +2.2 |
| Total | 100% | 23% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Maps, sections and a first report
- Process boreholes, GIS and lab
- Field camp, outcrop and sampling
- Read hazard, water and deposit
- Talk to works, mine or government
- Sign the opinion and own the real ground
- geologo
- geologist
Sources for this job· O*NET 19-2042.00· ESCO/ISCO 2114