IS WORK OVER?

Automation index

How much of a Industrial engineer’s job can AI already do?

Simulating a line and drafting a procedure can already be farmed out. Planting it into real shifts cannot.

This percentage does not predict how many people will lose their jobs.

Task comparison

Industrial engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Model processes, balances and a first plant layout.
Estimate

No public source provides a precise figure. This is our estimate.

22%45%+9.9
Draft procedures, PFDs and operating instructions.
Estimate

No public source provides a precise figure. This is our estimate.

18%40%+7.2
Analyse cost, bottlenecks and OEE from data.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Coordinate suppliers, maintenance and production.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Commissioning and plant trials.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Capex calls and industrial-safety liability.
Estimate

No public source provides a precise figure. This is our estimate.

12%10%+1.2
Total100%28%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Commissioning and plant trials
  • ingeniero industrial
  • industrial engineer
  • procesos industriales

Sources for this job· O*NET 17-2112.00· ESCO/ISCO 2141

Hydrologist

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Hydrograph, catchment and the model.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Field, gauging and the one that does not read.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Flood, the alert and not delaying.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Low flow, irrigation and the clash.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The authority, the figure and not dressing the flow.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
If the river rises, call it.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • hydrographs
  • catchments
  • gauging
  • floods
  • low flow
  • hydrology alerts
  • flows
  • the river authority

Sources for this job· O*NET 19-2043.00· ESCO/ISCO 2114

Analyse my job

Jobs with similar scores

  1. 99Plumber28%
  2. 100Photographer28%
  3. 101Tour guide28%
  4. 103Site reliability engineer28%
  5. 104Tax inspector28%
  6. 105Inventory clerk28%