Automation index
How much of a Industrial engineer’s job can AI already do?
Simulating a line and drafting a procedure can already be farmed out. Planting it into real shifts cannot.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Industrial engineer
28%
AI can already do 28% of this job.
#102 / 623
View rankingIndustrial engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Model processes, balances and a first plant layout.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 45% | +9.9 |
Draft procedures, PFDs and operating instructions.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 40% | +7.2 |
Analyse cost, bottlenecks and OEE from data.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Coordinate suppliers, maintenance and production.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Commissioning and plant trials.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
Capex calls and industrial-safety liability.EstimateNo public source provides a precise figure. This is our estimate. | 12% | 10% | +1.2 |
| Total | 100% | 28% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Commissioning and plant trials
- ingeniero industrial
- industrial engineer
- procesos industriales
Sources for this job· O*NET 17-2112.00· ESCO/ISCO 2141
IS WORK OVER?
Locksmith
15%
#609 / 623
View rankingLocksmith
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Emergency diary, quotes and invoices.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Diagnose lock, cylinder and possible pick.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 12% | +2.2 |
Opening, cylinder swap and fitting.EstimateNo public source provides a precise figure. This is our estimate. | 24% | 8% | +1.9 |
Fit electronic locks and access control.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 10% | +1.6 |
Cut keys and manage master systems.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 15% | +2.1 |
Helping a client in trouble, and travel.EstimateNo public source provides a precise figure. This is our estimate. | 12% | 18% | +2.2 |
| Total | 100% | 15% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Emergency diary, quotes and invoices
- Diagnose lock, cylinder and possible pick
- Opening, cylinder swap and fitting
- Fit electronic locks and access control
- Cut keys and manage master systems
- Helping a client in trouble, and travel
- cerrajer
- locksmith
- apertura de puertas
Sources for this job· O*NET 49-9094.00· ESCO/ISCO 7222