Automation index
How much of a Industrial engineer’s job can AI already do?
Simulating a line and drafting a procedure can already be farmed out. Planting it into real shifts cannot.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Industrial engineer
28%
AI can already do 28% of this job.
#102 / 623
View rankingIndustrial engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Model processes, balances and a first plant layout.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 45% | +9.9 |
Draft procedures, PFDs and operating instructions.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 40% | +7.2 |
Analyse cost, bottlenecks and OEE from data.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Coordinate suppliers, maintenance and production.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Commissioning and plant trials.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
Capex calls and industrial-safety liability.EstimateNo public source provides a precise figure. This is our estimate. | 12% | 10% | +1.2 |
| Total | 100% | 28% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Commissioning and plant trials
- ingeniero industrial
- industrial engineer
- procesos industriales
Sources for this job· O*NET 17-2112.00· ESCO/ISCO 2141
IS WORK OVER?
Mason
15%
#607 / 623
View rankingMason
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Read drawings, measure and order material.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 30% | +4.8 |
Setting out and levels on site.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 22% | +3.1 |
Raise walls, render and plaster.EstimateNo public source provides a precise figure. This is our estimate. | 24% | 8% | +1.9 |
Floors, tiling and finishing.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
Safety, scaffolding and clearing the bay.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 10% | +1.6 |
Coordinate with foreman, plumber and electrician.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 15% | +2.1 |
| Total | 100% | 15% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- build walls
- plaster
- site work
- Read drawings, measure and order material
- Setting out and levels on site
- Raise walls, render and plaster
- Floors, tiling and finishing
- Safety, scaffolding and clearing the bay
- albanil
- mason
Sources for this job· O*NET 47-2021.00· ESCO/ISCO 7112