IS WORK OVER?

Automation index

How much of a Industrial engineer’s job can AI already do?

Simulating a line and drafting a procedure can already be farmed out. Planting it into real shifts cannot.

This percentage does not predict how many people will lose their jobs.

Task comparison

Industrial engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Model processes, balances and a first plant layout.
Estimate

No public source provides a precise figure. This is our estimate.

22%45%+9.9
Draft procedures, PFDs and operating instructions.
Estimate

No public source provides a precise figure. This is our estimate.

18%40%+7.2
Analyse cost, bottlenecks and OEE from data.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Coordinate suppliers, maintenance and production.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Commissioning and plant trials.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Capex calls and industrial-safety liability.
Estimate

No public source provides a precise figure. This is our estimate.

12%10%+1.2
Total100%28%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Commissioning and plant trials
  • ingeniero industrial
  • industrial engineer
  • procesos industriales

Sources for this job· O*NET 17-2112.00· ESCO/ISCO 2141

Order picker

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
List, location and the scan.
Estimate

No public source provides a precise figure. This is our estimate.

16%48%+7.7
Aisle, height and the parcel that will not fit.
Estimate

No public source provides a precise figure. This is our estimate.

22%10%+2.2
Errors, the short and calling it.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Pace, the shift and the pallet that goes.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Peaks, Black Friday and not mixing orders.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Hit the SKU, and not leaving a lame pallet.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • picking
  • scan locations
  • shorts
  • build pallets
  • warehouse aisles
  • order peaks
  • SKUs
  • voice picking

Sources for this job· O*NET 53-7062.00· ESCO/ISCO 4321

Analyse my job

Jobs with similar scores

  1. 99Plumber28%
  2. 100Photographer28%
  3. 101Tour guide28%
  4. 103Site reliability engineer28%
  5. 104Tax inspector28%
  6. 105Inventory clerk28%