IS WORK OVER?

Automation index

How much of a Industrial engineer’s job can AI already do?

Simulating a line and drafting a procedure can already be farmed out. Planting it into real shifts cannot.

This percentage does not predict how many people will lose their jobs.

Task comparison

Industrial engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Model processes, balances and a first plant layout.
Estimate

No public source provides a precise figure. This is our estimate.

22%45%+9.9
Draft procedures, PFDs and operating instructions.
Estimate

No public source provides a precise figure. This is our estimate.

18%40%+7.2
Analyse cost, bottlenecks and OEE from data.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Coordinate suppliers, maintenance and production.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Commissioning and plant trials.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Capex calls and industrial-safety liability.
Estimate

No public source provides a precise figure. This is our estimate.

12%10%+1.2
Total100%28%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Commissioning and plant trials
  • ingeniero industrial
  • industrial engineer
  • procesos industriales

Sources for this job· O*NET 17-2112.00· ESCO/ISCO 2141

Piling operator

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Set-out, level and each pile’s log.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Drive, bore and refusal.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Cage, pour and the tube that rides up.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Vibration, the neighbour and stopping in time.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Plant, access and the one that will not fit.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
To level, and not cracking party walls.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • drive piles
  • bore
  • cages
  • refusal level
  • site vibration
  • pour piles
  • piling set-out
  • recoverable tubes

Sources for this job· O*NET 47-2073.00· ESCO/ISCO 7114

Analyse my job

Jobs with similar scores

  1. 99Plumber28%
  2. 100Photographer28%
  3. 101Tour guide28%
  4. 103Site reliability engineer28%
  5. 104Tax inspector28%
  6. 105Inventory clerk28%