Automation index
How much of a Industrial engineer’s job can AI already do?
Simulating a line and drafting a procedure can already be farmed out. Planting it into real shifts cannot.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Industrial engineer
28%
AI can already do 28% of this job.
#102 / 743
View rankingIndustrial engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Model processes, balances and a first plant layout.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 45% | +9.9 |
Draft procedures, PFDs and operating instructions.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 40% | +7.2 |
Analyse cost, bottlenecks and OEE from data.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Coordinate suppliers, maintenance and production.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Commissioning and plant trials.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
Capex calls and industrial-safety liability.EstimateNo public source provides a precise figure. This is our estimate. | 12% | 10% | +1.2 |
| Total | 100% | 28% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Commissioning and plant trials
- ingeniero industrial
- industrial engineer
- procesos industriales
Sources for this job· O*NET 17-2112.00· ESCO/ISCO 2141
IS WORK OVER?
PLC programmer
22%
#446 / 743
View rankingPLC programmer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Ladder, tags and the comment.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Cell, the fault and the one that will not stop.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
E-stop, the cable and not jumping it.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Recipe, the change and not dumping production.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The electrician, the terminals and going down to see it.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
That it stops on a fault, and not jumping the e-stop.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- program PLCs
- tags
- e-stops
- faults
- recipes
- terminals
- program comments
- not jump e-stops
Sources for this job· O*NET 15-1252.00· ESCO/ISCO 2514