Automation index
How much of a Industrial engineer’s job can AI already do?
Simulating a line and drafting a procedure can already be farmed out. Planting it into real shifts cannot.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Industrial engineer
28%
AI can already do 28% of this job.
#102 / 623
View rankingIndustrial engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Model processes, balances and a first plant layout.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 45% | +9.9 |
Draft procedures, PFDs and operating instructions.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 40% | +7.2 |
Analyse cost, bottlenecks and OEE from data.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Coordinate suppliers, maintenance and production.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Commissioning and plant trials.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
Capex calls and industrial-safety liability.EstimateNo public source provides a precise figure. This is our estimate. | 12% | 10% | +1.2 |
| Total | 100% | 28% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Commissioning and plant trials
- ingeniero industrial
- industrial engineer
- procesos industriales
Sources for this job· O*NET 17-2112.00· ESCO/ISCO 2141
IS WORK OVER?
Professional athlete
15%
#611 / 623
View rankingProfessional athlete
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Load plans, nutrition and video analysis.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 35% | +5.6 |
Social, contracts and travel diary.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 28% | +3.9 |
Train and compete the craft.EstimateNo public source provides a precise figure. This is our estimate. | 26% | 4% | +1 |
Physio, sleep and prevention.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 8% | +1.3 |
Wear the shirt, press and the dressing room.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 10% | +1.4 |
Manage an injury and the end of a career.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 15% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Load plans, nutrition and video analysis
- Social, contracts and travel diary
- Train and compete the craft
- Physio, sleep and prevention
- Manage an injury and the end of a career
- deportista
- atleta profesional
- futbolista
- professional athlete
Sources for this job· O*NET 27-2021.00· ESCO/ISCO 3421