IS WORK OVER?

Automation index

How much of a Industrial engineer’s job can AI already do?

Simulating a line and drafting a procedure can already be farmed out. Planting it into real shifts cannot.

This percentage does not predict how many people will lose their jobs.

Task comparison

Industrial engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Model processes, balances and a first plant layout.
Estimate

No public source provides a precise figure. This is our estimate.

22%45%+9.9
Draft procedures, PFDs and operating instructions.
Estimate

No public source provides a precise figure. This is our estimate.

18%40%+7.2
Analyse cost, bottlenecks and OEE from data.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Coordinate suppliers, maintenance and production.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Commissioning and plant trials.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Capex calls and industrial-safety liability.
Estimate

No public source provides a precise figure. This is our estimate.

12%10%+1.2
Total100%28%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Commissioning and plant trials
  • ingeniero industrial
  • industrial engineer
  • procesos industriales

Sources for this job· O*NET 17-2112.00· ESCO/ISCO 2141

Screenwriter

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Bibles, treatments and sequence breakdowns.
Estimate

No public source provides a precise figure. This is our estimate.

20%48%+9.6
Dialogue, variants and fast rewrites.
Estimate

No public source provides a precise figure. This is our estimate.

20%40%+8
Writers’ room and showrunner notes.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Fit to budget, locations and cast.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Pitch, sale and studio relationship.
Estimate

No public source provides a precise figure. This is our estimate.

14%15%+2.1
Decide tone, cut and what is not written.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%26%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Bibles, treatments and sequence breakdowns
  • Dialogue, variants and fast rewrites
  • Writers’ room and showrunner notes
  • Fit to budget, locations and cast
  • Pitch, sale and studio relationship
  • Decide tone, cut and what is not written
  • guionista
  • screenwriter
  • script

Sources for this job· O*NET 27-3043.00· ESCO/ISCO 2641

Analyse my job

Jobs with similar scores

  1. 99Plumber28%
  2. 100Photographer28%
  3. 101Tour guide28%
  4. 103Site reliability engineer28%
  5. 104Tax inspector28%
  6. 105Inventory clerk28%