IS WORK OVER?

Automation index

How much of a Industrial engineer’s job can AI already do?

Simulating a line and drafting a procedure can already be farmed out. Planting it into real shifts cannot.

This percentage does not predict how many people will lose their jobs.

Task comparison

Industrial engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Model processes, balances and a first plant layout.
Estimate

No public source provides a precise figure. This is our estimate.

22%45%+9.9
Draft procedures, PFDs and operating instructions.
Estimate

No public source provides a precise figure. This is our estimate.

18%40%+7.2
Analyse cost, bottlenecks and OEE from data.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Coordinate suppliers, maintenance and production.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Commissioning and plant trials.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Capex calls and industrial-safety liability.
Estimate

No public source provides a precise figure. This is our estimate.

12%10%+1.2
Total100%28%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Commissioning and plant trials
  • ingeniero industrial
  • industrial engineer
  • procesos industriales

Sources for this job· O*NET 17-2112.00· ESCO/ISCO 2141

Stevedore

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Stow plans, shifts and logs.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Hook, guide and lash cargo.
Estimate

No public source provides a precise figure. This is our estimate.

24%8%+1.9
Quay, cranes and danger zones.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Team, radio and foreman.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Dangerous goods and checks.
Estimate

No public source provides a precise figure. This is our estimate.

14%22%+3.1
Not leaving a container badly lashed.
Estimate

No public source provides a precise figure. This is our estimate.

14%14%+2
Total100%16%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Stow plans, shifts and logs
  • Hook, guide and lash cargo
  • Quay, cranes and danger zones
  • Team, radio and foreman
  • Dangerous goods and checks
  • Not leaving a container badly lashed
  • estibador
  • estiba
  • stevedore

Sources for this job· O*NET 53-7062.00· ESCO/ISCO 9333

Analyse my job

Jobs with similar scores

  1. 99Plumber28%
  2. 100Photographer28%
  3. 101Tour guide28%
  4. 103Site reliability engineer28%
  5. 104Tax inspector28%
  6. 105Inventory clerk28%