Automation index
How much of a Industrial engineer’s job can AI already do?
Simulating a line and drafting a procedure can already be farmed out. Planting it into real shifts cannot.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Industrial engineer
28%
AI can already do 28% of this job.
#102 / 623
View rankingIndustrial engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Model processes, balances and a first plant layout.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 45% | +9.9 |
Draft procedures, PFDs and operating instructions.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 40% | +7.2 |
Analyse cost, bottlenecks and OEE from data.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Coordinate suppliers, maintenance and production.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Commissioning and plant trials.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
Capex calls and industrial-safety liability.EstimateNo public source provides a precise figure. This is our estimate. | 12% | 10% | +1.2 |
| Total | 100% | 28% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Commissioning and plant trials
- ingeniero industrial
- industrial engineer
- procesos industriales
Sources for this job· O*NET 17-2112.00· ESCO/ISCO 2141
IS WORK OVER?
Tool and die maker
25%
#244 / 623
View rankingTool and die maker
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Read the die, clearances and the 3D drawing.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Machine, fit and try the tooling.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
Mount in the press, shoot and correct.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 22% | +4 |
EDM, polish and cavity finish.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Die maintenance and changeovers.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Die life and liability for the part.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 14% | +2.2 |
| Total | 100% | 25% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- make dies
- fit tooling
- run EDM
- try out tooling
- polish cavities
- mount in the press
- maintain moulds
- correct clearances
Sources for this job· O*NET 51-4111.00· ESCO/ISCO 7222