Automation index
How much of a Industrial engineer’s job can AI already do?
Simulating a line and drafting a procedure can already be farmed out. Planting it into real shifts cannot.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Industrial engineer
28%
AI can already do 28% of this job.
#102 / 623
View rankingIndustrial engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Model processes, balances and a first plant layout.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 45% | +9.9 |
Draft procedures, PFDs and operating instructions.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 40% | +7.2 |
Analyse cost, bottlenecks and OEE from data.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Coordinate suppliers, maintenance and production.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Commissioning and plant trials.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
Capex calls and industrial-safety liability.EstimateNo public source provides a precise figure. This is our estimate. | 12% | 10% | +1.2 |
| Total | 100% | 28% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Commissioning and plant trials
- ingeniero industrial
- industrial engineer
- procesos industriales
Sources for this job· O*NET 17-2112.00· ESCO/ISCO 2141
IS WORK OVER?
Warehouse supervisor
24%
#270 / 623
View rankingWarehouse supervisor
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Docks, waves and the shift plan.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
The team, the peak and the one who cannot keep up.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Stock, shrink and the mystery gap.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Safety, forklifts and the near miss.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The late haulier and not mixing the docks.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
Get the shift out, and not mixing the goods.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 14% | +2.2 |
| Total | 100% | 24% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- plan docks
- waves
- warehouse shift
- shrink
- forklifts
- near misses
- outbound peaks
- mixed goods
Sources for this job· O*NET 53-1048.00· ESCO/ISCO 1324