Automation index
How much of a Industrial engineer’s job can AI already do?
Simulating a line and drafting a procedure can already be farmed out. Planting it into real shifts cannot.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Industrial engineer
28%
AI can already do 28% of this job.
#102 / 623
View rankingIndustrial engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Model processes, balances and a first plant layout.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 45% | +9.9 |
Draft procedures, PFDs and operating instructions.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 40% | +7.2 |
Analyse cost, bottlenecks and OEE from data.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Coordinate suppliers, maintenance and production.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Commissioning and plant trials.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
Capex calls and industrial-safety liability.EstimateNo public source provides a precise figure. This is our estimate. | 12% | 10% | +1.2 |
| Total | 100% | 28% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Commissioning and plant trials
- ingeniero industrial
- industrial engineer
- procesos industriales
Sources for this job· O*NET 17-2112.00· ESCO/ISCO 2141
IS WORK OVER?
Wildland firefighter
18%
#544 / 623
View rankingWildland firefighter
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Logs, map and the day’s attack plan.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Line, hose-lay and the spot fire.EstimateNo public source provides a precise figure. This is our estimate. | 24% | 6% | +1.4 |
Tools, pump and the water that does not arrive.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Night watch, lookout and the flare-up.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Coordinate aircraft and the command post.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 28% | +3.9 |
Get out whole and leave nobody behind.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 10% | +1.4 |
| Total | 100% | 18% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- fight wildfires
- cut line
- lay hose
- night watch
- portable pump
- air assets
- fire-front map
- spot fires
Sources for this job· O*NET 33-2022.00· ESCO/ISCO 5411