Automation index
How much of a Information specialist’s job can AI already do?
Filing a PDF and a thesaurus come earlier. Retrieving what the house does not know it has do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Information specialist
31%
AI can already do 31% of this job.
#33 / 733
View rankingInformation specialist
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Classify, index and describe holdings.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Thesauri, metadata and the internal search.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 52% | +8.3 |
Answer queries and retrieve what nobody can find.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Records policy, retention and destruction.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 22% | +4 |
Train people who file badly and people who do not file.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
The organisation’s memory, and not losing it.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 14% | +2.2 |
| Total | 100% | 30% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- manage records
- index holdings
- classify archives
- retrieve information
- metadata
- thesauri
- retention policy
- internal search
Sources for this job· O*NET 25-4013.00· ESCO/ISCO 2622
IS WORK OVER?
Bridge engineer
22%
#386 / 733
View rankingBridge engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Model, loads and the span.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Works, the prestress and the one who did not tension.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Inspection, the crack and not looking away.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Traffic, the closure and not leaving the village hanging.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The contractor, the rush and not jumping to a yes.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
That it takes the lorry, and not signing the crack.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- spans
- prestress
- cracks
- bridge inspection
- loads
- traffic closures
- structural models
- tensioning
Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142