IS WORK OVER?

Automation index

How much of a Instrumentation engineer’s job can AI already do?

A datasheet comes earlier. It actually reading without leaving the bypass open do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Instrumentation engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Datasheet, the range and the loop.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Field, the transmitter and the one that will not arrive.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Calibrate, the standard and not signing the drift.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Bypass, the valve and not leaving it open.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Process, the rush and not jumping to a yes.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
That it reads, and not leaving the bypass open.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • datasheets
  • instrument loops
  • transmitters
  • calibrate
  • standards
  • bypass
  • ranges
  • drift

Sources for this job· O*NET 17-3023.00· ESCO/ISCO 2149

Facilities engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
CMMS, tickets and the PPM.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Roof, the chiller and the one that will not start.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Generator, the diesel and not leaving it dry.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Fire, the pump and the monthly test.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The tenant, August and not jumping to a yes.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
That cooling does not die, and not leaving the generator dry.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • CMMS
  • PPM
  • chillers
  • generators
  • diesel
  • fire pumps
  • roofs
  • tickets

Sources for this job· O*NET 17-2199.00· ESCO/ISCO 2149

Analyse my job

Jobs with similar scores

  1. 388Agronomist22%
  2. 389Control engineer22%
  3. 390Corrosion engineer22%
  4. 392Facilities engineer22%
  5. 393Mechatronics engineer22%
  6. 394Mining engineer22%