Automation index
How much of a Instrumentation engineer’s job can AI already do?
A datasheet comes earlier. It actually reading without leaving the bypass open do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Instrumentation engineer
22%
AI can already do 22% of this job.
#391 / 753
View rankingInstrumentation engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Datasheet, the range and the loop.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Field, the transmitter and the one that will not arrive.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Calibrate, the standard and not signing the drift.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Bypass, the valve and not leaving it open.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Process, the rush and not jumping to a yes.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
That it reads, and not leaving the bypass open.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- datasheets
- instrument loops
- transmitters
- calibrate
- standards
- bypass
- ranges
- drift
Sources for this job· O*NET 17-3023.00· ESCO/ISCO 2149
IS WORK OVER?
Geomatics engineer
22%
#402 / 753
View rankingGeomatics engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Station, the base and the cloud.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Field, the axis and the one that moved.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Model, the drift and not hiding metres.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Works, the setting-out and going down to see it.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The contractor, the rush and not signing the drift.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
That the axis is there, and not signing metres.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- point clouds
- total stations
- axes
- setting-out
- drift
- bases
- geomatics
- the field
Sources for this job· O*NET 17-1022.00· ESCO/ISCO 2165