IS WORK OVER?

Automation index

How much of a Instrumentation engineer’s job can AI already do?

A datasheet comes earlier. It actually reading without leaving the bypass open do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Instrumentation engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Datasheet, the range and the loop.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Field, the transmitter and the one that will not arrive.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Calibrate, the standard and not signing the drift.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Bypass, the valve and not leaving it open.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Process, the rush and not jumping to a yes.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
That it reads, and not leaving the bypass open.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • datasheets
  • instrument loops
  • transmitters
  • calibrate
  • standards
  • bypass
  • ranges
  • drift

Sources for this job· O*NET 17-3023.00· ESCO/ISCO 2149

Site engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Setting-out, axes and the level.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Rebar, cover and the one that is missing.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Concrete, the slump and not pouring if it fails.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Note, the diary and not dressing the delay.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The site manager, the rush and not covering bad steel.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
That the column is there, and not covering the steel.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • setting-out
  • axes
  • rebar
  • cover
  • slump
  • site diary
  • levels
  • not cover steel

Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142

Analyse my job

Jobs with similar scores

  1. 385Agronomist22%
  2. 386Control engineer22%
  3. 387Corrosion engineer22%
  4. 389Mechatronics engineer22%
  5. 390Mining engineer22%
  6. 391Bridge engineer22%