IS WORK OVER?

Automation index

How much of a Insulation installer’s job can AI already do?

A thickness calc comes earlier. No thermal bridge and a liveable house do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Insulation installer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Measure, thicknesses and the panel list.
Estimate

No public source provides a precise figure. This is our estimate.

16%36%+5.8
Fit, seal and the bridge you leave.
Estimate

No public source provides a precise figure. This is our estimate.

18%12%+2.2
Roof, façade and the wind on the scaffold.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Barriers, vapour and condensation.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
The designer, the change and late material.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
No bridge, and not crushing the insulation.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • fit insulation
  • thermal bridges
  • vapour barrier
  • thicknesses
  • insulated façade
  • condensation
  • seal panels
  • roof

Sources for this job· O*NET 47-2131.00· ESCO/ISCO 7124

Drainlayer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Drawings, cameras and connection logs.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Open, pipe and set the fall.
Estimate

No public source provides a precise figure. This is our estimate.

24%8%+1.9
Pits, gases and confined spaces.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Street, neighbours and reinstating pavement.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Quantities, extras and the council.
Estimate

No public source provides a precise figure. This is our estimate.

14%22%+3.1
Not leaving a connection that bursts.
Estimate

No public source provides a precise figure. This is our estimate.

14%14%+2
Total100%16%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Drawings, cameras and connection logs
  • Open, pipe and set the fall
  • Pits, gases and confined spaces
  • Quantities, extras and the council
  • Not leaving a connection that bursts
  • pocero
  • alcantarillado
  • drainlayer

Sources for this job· O*NET 47-2151.00· ESCO/ISCO 7126

Analyse my job

Jobs with similar scores

  1. 315Crime scene technician23%
  2. 316CCTV technician23%
  3. 317Aquaculturist22%
  4. 319Pesticide applicator22%
  5. 320Archaeologist22%
  6. 321Building surveyor22%