IS WORK OVER?

Automation index

How much of a Insulation installer’s job can AI already do?

A thickness calc comes earlier. No thermal bridge and a liveable house do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Insulation installer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Measure, thicknesses and the panel list.
Estimate

No public source provides a precise figure. This is our estimate.

16%36%+5.8
Fit, seal and the bridge you leave.
Estimate

No public source provides a precise figure. This is our estimate.

18%12%+2.2
Roof, façade and the wind on the scaffold.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Barriers, vapour and condensation.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
The designer, the change and late material.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
No bridge, and not crushing the insulation.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • fit insulation
  • thermal bridges
  • vapour barrier
  • thicknesses
  • insulated façade
  • condensation
  • seal panels
  • roof

Sources for this job· O*NET 47-2131.00· ESCO/ISCO 7124

Materials engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Tests, metallography and the spec.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Shop, heat treatment and the part that fails spec.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Material choice, corrosion and fatigue.
Estimate

No public source provides a precise figure. This is our estimate.

16%36%+5.8
Supplier, certificates and the doubtful batch.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The field failure and the root cause.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
That it does not fail, and not swapping the material blind.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%27%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • materials tests
  • metallography
  • choose alloys
  • corrosion
  • fatigue
  • heat treatment
  • failure analysis
  • batch certificates

Sources for this job· O*NET 17-2131.00· ESCO/ISCO 2149

Analyse my job

Jobs with similar scores

  1. 315Crime scene technician23%
  2. 316CCTV technician23%
  3. 317Aquaculturist22%
  4. 319Pesticide applicator22%
  5. 320Archaeologist22%
  6. 321Building surveyor22%