IS WORK OVER?

Automation index

How much of a Insulation installer’s job can AI already do?

A thickness calc comes earlier. No thermal bridge and a liveable house do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Insulation installer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Measure, thicknesses and the panel list.
Estimate

No public source provides a precise figure. This is our estimate.

16%36%+5.8
Fit, seal and the bridge you leave.
Estimate

No public source provides a precise figure. This is our estimate.

18%12%+2.2
Roof, façade and the wind on the scaffold.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Barriers, vapour and condensation.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
The designer, the change and late material.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
No bridge, and not crushing the insulation.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • fit insulation
  • thermal bridges
  • vapour barrier
  • thicknesses
  • insulated façade
  • condensation
  • seal panels
  • roof

Sources for this job· O*NET 47-2131.00· ESCO/ISCO 7124

Metro driver

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Checks, tests and the cab log.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Drive, stop at platforms and regulate running.
Estimate

No public source provides a precise figure. This is our estimate.

24%8%+1.9
Incidents, evacuation and talk to Control.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Timetables, reliefs and the day’s orders.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Passengers, platforms and announcements.
Estimate

No public source provides a precise figure. This is our estimate.

14%18%+2.5
Rules, fatigue and liability for the train.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • drive metro trains
  • stop at platforms
  • regulate running
  • evacuate tunnels
  • talk to control
  • cab checks
  • handle incidents
  • drive under ATO

Sources for this job· O*NET 53-4041.00· ESCO/ISCO 8311

Analyse my job

Jobs with similar scores

  1. 315Crime scene technician23%
  2. 316CCTV technician23%
  3. 317Aquaculturist22%
  4. 319Pesticide applicator22%
  5. 320Archaeologist22%
  6. 321Building surveyor22%