Automation index
How much of a Insulation installer’s job can AI already do?
A thickness calc comes earlier. No thermal bridge and a liveable house do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Insulation installer
22%
AI can already do 22% of this job.
#318 / 633
View rankingInsulation installer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Measure, thicknesses and the panel list.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 36% | +5.8 |
Fit, seal and the bridge you leave.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 12% | +2.2 |
Roof, façade and the wind on the scaffold.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Barriers, vapour and condensation.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
The designer, the change and late material.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
No bridge, and not crushing the insulation.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- fit insulation
- thermal bridges
- vapour barrier
- thicknesses
- insulated façade
- condensation
- seal panels
- roof
Sources for this job· O*NET 47-2131.00· ESCO/ISCO 7124
IS WORK OVER?
Miner
16%
#606 / 633
View rankingMiner
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Logs, blast plans and sensors.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Logged maintenance and mine CMMS.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 22% | +3.1 |
Drill, load and extract.EstimateNo public source provides a precise figure. This is our estimate. | 24% | 10% | +2.4 |
Support, ventilation and water.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
Safety, gases and evacuation.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 10% | +1.6 |
Shift, partner and not getting casual.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 14% | +2 |
| Total | 100% | 16% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Logs, blast plans and sensors
- Logged maintenance and mine CMMS
- Drill, load and extract
- Support, ventilation and water
- Safety, gases and evacuation
- Shift, partner and not getting casual
- minero
- miner
- interior de mina
Sources for this job· O*NET 47-5041.00· ESCO/ISCO 8111