IS WORK OVER?

Automation index

How much of a Insulation installer’s job can AI already do?

A thickness calc comes earlier. No thermal bridge and a liveable house do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Insulation installer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Measure, thicknesses and the panel list.
Estimate

No public source provides a precise figure. This is our estimate.

16%36%+5.8
Fit, seal and the bridge you leave.
Estimate

No public source provides a precise figure. This is our estimate.

18%12%+2.2
Roof, façade and the wind on the scaffold.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Barriers, vapour and condensation.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
The designer, the change and late material.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
No bridge, and not crushing the insulation.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • fit insulation
  • thermal bridges
  • vapour barrier
  • thicknesses
  • insulated façade
  • condensation
  • seal panels
  • roof

Sources for this job· O*NET 47-2131.00· ESCO/ISCO 7124

Mixer-truck driver

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Order, mix and mixing time.
Estimate

No public source provides a precise figure. This is our estimate.

16%36%+5.8
Drive, site and the tight access.
Estimate

No public source provides a precise figure. This is our estimate.

22%10%+2.2
Pour, pump and the one who wants more water.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Wash, leftovers and not leaving a hard drum.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The jam, the delay and the concrete that sets.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Arrive fresh, and not adding extra water.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%21%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • drive mixers
  • batch
  • pour concrete
  • wash the drum
  • slump
  • concrete pump
  • mix order
  • site access

Sources for this job· O*NET 53-3032.00· ESCO/ISCO 8332

Analyse my job

Jobs with similar scores

  1. 320Crime scene technician23%
  2. 321CCTV technician23%
  3. 322Aquaculturist22%
  4. 324Pesticide applicator22%
  5. 325Archaeologist22%
  6. 326Building surveyor22%