Automation index
How much of a Insurance claims adjuster’s job can AI already do?
A claim form and some photos come earlier. Valuing the damage on site and closing the claim do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Insurance claims adjuster
29%
AI can already do 29% of this job.
#68 / 753
View rankingInsurance claims adjuster
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Read policy, claim form and cover.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
On-site inspection, photos and facts.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
Value damage, parts and write the report.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Negotiate with garage, injured party and insurer.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Fraud, recoveries and clash with another adjuster.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Close the file and own the valuation.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 14% | +2.2 |
| Total | 100% | 28% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- adjust claims
- assess damage
- inspect on site
- value repairs
- spot fraud
- negotiate payouts
- write survey reports
- close claims
Sources for this job· O*NET 13-1031.00· ESCO/ISCO 3315
IS WORK OVER?
HVAC engineer
27%
#173 / 753
View rankingHVAC engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Loads, flows and the plant.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Works, the duct and the one they crushed.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Commissioning, the balance and the room that sweats.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Noise, the grille and not leaving the whistle.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The client, the saving and not killing the fresh air.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
That it does not sweat, and not oversizing.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 27% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- load calcs
- air flows
- ducts
- balancing
- grilles
- fresh air
- whistles
- HVAC plant
Sources for this job· O*NET 17-2199.00· ESCO/ISCO 2149