Automation index
How much of a Insurance claims adjuster’s job can AI already do?
A claim form and some photos come earlier. Valuing the damage on site and closing the claim do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Insurance claims adjuster
29%
AI can already do 29% of this job.
#68 / 623
View rankingInsurance claims adjuster
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Read policy, claim form and cover.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
On-site inspection, photos and facts.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
Value damage, parts and write the report.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Negotiate with garage, injured party and insurer.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Fraud, recoveries and clash with another adjuster.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Close the file and own the valuation.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 14% | +2.2 |
| Total | 100% | 28% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- adjust claims
- assess damage
- inspect on site
- value repairs
- spot fraud
- negotiate payouts
- write survey reports
- close claims
Sources for this job· O*NET 13-1031.00· ESCO/ISCO 3315
IS WORK OVER?
Structural engineer
26%
#204 / 623
View rankingStructural engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Model, combinations and the calculation annex.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 52% | +9.4 |
Site, rebar and what was not poured that way.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Code, building regs and the sizing note.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 36% | +5.8 |
Pathology, the crack and shore or not.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
The architect, the deadline and not trimming the depth.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Sign that it stands, and not hiding the assumption.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 26% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- calculate structures
- frame model
- calculation annex
- building regs
- rebar
- structural pathology
- load combinations
- shore
Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142