Automation index
How much of a Insurance claims adjuster’s job can AI already do?
A claim form and some photos come earlier. Valuing the damage on site and closing the claim do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Insurance claims adjuster
29%
AI can already do 29% of this job.
#68 / 623
View rankingInsurance claims adjuster
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Read policy, claim form and cover.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
On-site inspection, photos and facts.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
Value damage, parts and write the report.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Negotiate with garage, injured party and insurer.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Fraud, recoveries and clash with another adjuster.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Close the file and own the valuation.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 14% | +2.2 |
| Total | 100% | 28% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- adjust claims
- assess damage
- inspect on site
- value repairs
- spot fraud
- negotiate payouts
- write survey reports
- close claims
Sources for this job· O*NET 13-1031.00· ESCO/ISCO 3315
IS WORK OVER?
Tower crane operator
18%
#563 / 623
View rankingTower crane operator
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Radius, winds and the day’s log.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Hoist, trolley and the slinger’s call.EstimateNo public source provides a precise figure. This is our estimate. | 24% | 6% | +1.4 |
Erect, climb and the base that is checked.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Two-crane lifts and crossing jibs.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The wind that gets up and stopping in time.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 18% | +2.5 |
Sweep nobody, and not pushing the radius.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 10% | +1.4 |
| Total | 100% | 18% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- tower-crane lifts
- load charts
- climb the crane
- slinger’s call
- jib wind
- crossing jibs
- crane base
- trolley
Sources for this job· O*NET 53-7021.00· ESCO/ISCO 8343