Automation index
How much of a Intensivist’s job can AI already do?
A ventilation protocol comes earlier. Intubating on time and talking to the family at 3 a.m. do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Intensivist
20%
AI can already do 20% of this job.
#543 / 743
View rankingIntensivist
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Protocols, scores and the on-call plan.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 36% | +5.8 |
Airway, vasopressors and the patient who crashes.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Ventilation, balances and taking the tube out.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Bedside ultrasound and ICU procedures.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Family, limits and the yes or no to admission.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
On-call, the error and owning the bed.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 10% | +1.4 |
| Total | 100% | 20% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- intubate
- ICU ventilation
- vasopressors
- difficult airway
- bedside ultrasound
- limit treatment
- ICU scores
- extubate
Sources for this job· O*NET 29-1229.00· ESCO/ISCO 2212
IS WORK OVER?
Commissioning engineer
22%
#392 / 743
View rankingCommissioning engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Protocol, the loop and the punch.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Plant, start-up and the one that is not ready.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Test, the trip and not jumping it.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Vendors, the one who does not come and the spare.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The client, the deadline and not signing half done.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
Start up, and not leaving the interlock jumped.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- test protocols
- loops
- punch list
- start-up
- trips
- vendors
- interlocks
- not sign half done
Sources for this job· O*NET 17-2199.00· ESCO/ISCO 2149