Automation index
How much of a Intensivist’s job can AI already do?
A ventilation protocol comes earlier. Intubating on time and talking to the family at 3 a.m. do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Intensivist
20%
AI can already do 20% of this job.
#464 / 643
View rankingIntensivist
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Protocols, scores and the on-call plan.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 36% | +5.8 |
Airway, vasopressors and the patient who crashes.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Ventilation, balances and taking the tube out.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Bedside ultrasound and ICU procedures.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Family, limits and the yes or no to admission.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
On-call, the error and owning the bed.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 10% | +1.4 |
| Total | 100% | 20% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- intubate
- ICU ventilation
- vasopressors
- difficult airway
- bedside ultrasound
- limit treatment
- ICU scores
- extubate
Sources for this job· O*NET 29-1229.00· ESCO/ISCO 2212
IS WORK OVER?
Mixer-truck driver
21%
#421 / 643
View rankingMixer-truck driver
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Order, mix and mixing time.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 36% | +5.8 |
Drive, site and the tight access.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 10% | +2.2 |
Pour, pump and the one who wants more water.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Wash, leftovers and not leaving a hard drum.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The jam, the delay and the concrete that sets.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Arrive fresh, and not adding extra water.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 21% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- drive mixers
- batch
- pour concrete
- wash the drum
- slump
- concrete pump
- mix order
- site access
Sources for this job· O*NET 53-3032.00· ESCO/ISCO 8332