IS WORK OVER?

Automation index

How much of a Interior designer’s job can AI already do?

A render and a moodboard come earlier. Measuring a real flat, and fighting a wall with the client, do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Interior designer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Moodboards, renders and a first plan.
Estimate

No public source provides a precise figure. This is our estimate.

20%48%+9.6
Budget, lines and orders.
Estimate

No public source provides a precise figure. This is our estimate.

16%38%+6.1
Measure, visit and read the real light.
Estimate

No public source provides a precise figure. This is our estimate.

16%15%+2.4
Works, trades and surprises.
Estimate

No public source provides a precise figure. This is our estimate.

16%14%+2.2
Client, changes of mind and close.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Taste: what stays and what is noise.
Estimate

No public source provides a precise figure. This is our estimate.

16%16%+2.6
Total100%25%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • design interfaces
  • prototypes
  • figma
  • Moodboards, renders and a first plan
  • Budget, lines and orders
  • Measure, visit and read the real light
  • Works, trades and surprises
  • Client, changes of mind and close
  • Taste: what stays and what is noise
  • interiorista

Sources for this job· O*NET 27-1025.00· ESCO/ISCO 3432

Air traffic controller

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Plan sequences and read traffic forecasts.
Estimate

No public source provides a precise figure. This is our estimate.

18%32%+5.8
Strips, tickets and inter-unit coordination.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Tactical control of aircraft on frequency.
Estimate

No public source provides a precise figure. This is our estimate.

22%6%+1.3
Resolve conflicts, radio failures and weather.
Estimate

No public source provides a precise figure. This is our estimate.

16%10%+1.6
Train and supervise a controller under instruction.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Reports, incidents and shift fatigue.
Estimate

No public source provides a precise figure. This is our estimate.

14%15%+2.1
Total100%17%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Plan sequences and read traffic forecasts
  • Tactical control of aircraft on frequency
  • Reports, incidents and shift fatigue
  • controlador aereo
  • air traffic
  • atc
  • torre de control

Sources for this job· O*NET 53-2021.00· ESCO/ISCO 3154

Analyse my job

Jobs with similar scores

  1. 239Mechanical engineer25%
  2. 240Naval architect25%
  3. 241Chemical engineer25%
  4. 243Brewer25%
  5. 244Tool and die maker25%
  6. 245Auto mechanic25%