IS WORK OVER?

Automation index

How much of a Interior designer’s job can AI already do?

A render and a moodboard come earlier. Measuring a real flat, and fighting a wall with the client, do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Interior designer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Moodboards, renders and a first plan.
Estimate

No public source provides a precise figure. This is our estimate.

20%48%+9.6
Budget, lines and orders.
Estimate

No public source provides a precise figure. This is our estimate.

16%38%+6.1
Measure, visit and read the real light.
Estimate

No public source provides a precise figure. This is our estimate.

16%15%+2.4
Works, trades and surprises.
Estimate

No public source provides a precise figure. This is our estimate.

16%14%+2.2
Client, changes of mind and close.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Taste: what stays and what is noise.
Estimate

No public source provides a precise figure. This is our estimate.

16%16%+2.6
Total100%25%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • design interfaces
  • prototypes
  • figma
  • Moodboards, renders and a first plan
  • Budget, lines and orders
  • Measure, visit and read the real light
  • Works, trades and surprises
  • Client, changes of mind and close
  • Taste: what stays and what is noise
  • interiorista

Sources for this job· O*NET 27-1025.00· ESCO/ISCO 3432

CAD designer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Model, dimensions and the drawing.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Clash, the hit and not leaving it.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
List, the material and the one that does not exist.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Change, the revision and not losing the native.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The shop, the doubt and going down to see it.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
That it can be made, and not leaving the clash.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%27%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • 3D models
  • dimensions
  • clashes
  • bills of materials
  • revisions
  • shop drawings
  • natives
  • hits

Sources for this job· O*NET 17-3013.00· ESCO/ISCO 3118

Analyse my job

Jobs with similar scores

  1. 275Mechanical engineer25%
  2. 276Naval architect25%
  3. 277Chemical engineer25%
  4. 279Brewer25%
  5. 280Tool and die maker25%
  6. 281Auto mechanic25%